New build Stuttgart – Max real-world lab for hemp building materials

');">
New build Stuttgart
© atzinger consulting
Projects /New build Stuttgart

New build Stuttgart

Max real-world lab for hemp building materials — a timber-frame family home with Hemplith® from the façade to the underfloor heating. A project in the IBA’27 StadtRegion Stuttgart network.

Enquire about a project →
Reference project · 70619 Stuttgart

A home as a real-world lab for hemp.

In Stuttgart, a three-storey family home is being built to show how far hemp building materials can go in today’s new construction. On a solid hillside storey made of recycled concrete stands a timber frame in which Hemplith® products are used in the façade, interior walls, ceilings, roof and floor.

The project was planned by atzinger consulting and designed by larob. studio für architektur; von Hanf supplies the building materials. As part of the International Building Exhibition 2027 StadtRegion Stuttgart network, the house is a showcase for students, trade associations and the housing industry.

Architecture larob. studio für architektur Planning atzinger consulting Materials von Hanf Electrical ET Kaiser
New build Stuttgart
New build Stuttgart
New build Stuttgart
New build Stuttgart
New build Stuttgart
New build Stuttgart
New build Stuttgart
New build Stuttgart
New build Stuttgart
© Photos: atzinger consulting – used with kind permission. All rights reserved by the author.
Key data

The project in figures

New build Stuttgart New build Stuttgart
North and south elevations · Drawing: larob. studio für architektur
Building Detached house, 1 residential unit
Storeys 3 full storeys
Living area 150 m²
Gross floor area 260 m²
Plot 502 m²
Construction Solid hillside storey (recycled concrete), timber frame above ground floor
Roof Mansard roof with clay tiles
Surfaces Clay and lime plaster inside, lime render outside
Services Air-source heat pump, smart home, rainwater cistern
Location 70619 Stuttgart
Start of construction March 2026
Construction diary

From planning application to topping-out.

New build Stuttgart – Planning application submitted
April 2025
Planning application submitted

The site is prepared and the first construction partners are selected.

New build Stuttgart – Groundbreaking
3 March 2026
Groundbreaking

Official start of construction.

New build Stuttgart – Ground floor shell
March 2026
Ground floor shell

The solid hillside storey and the carport foundations are built.

New build Stuttgart – Timber frame upper floors
May 2026
Timber frame upper floors

Prefabricated frame elements are installed and Hemplith Block is laid into the ceilings.

New build Stuttgart – Topping-out ceremony
3 June 2026
Topping-out ceremony

The timber frame is complete; the service layer of hemp blocks is installed.

New build Stuttgart – Site visits
June – July 2026
Site visits

Visits by HfT Stuttgart, the German prefabricated timber construction association and a regional housing company.

© Photos: atzinger consulting – used with kind permission. All rights reserved by the author.
IBA’27

Part of the International Building Exhibition 2027.

One hundred years after the Weissenhof Estate, IBA’27 StadtRegion Stuttgart asks how we want to live and work in the region in the future — with innovative projects, new living and working environments and sustainable materials and construction methods.

The Stuttgart new build is part of the IBA’27 network and shows what hemp building materials can achieve in housing: storing CO₂ instead of emitting it, vapour-open construction and a healthy indoor climate.